Xinxiang Xinya Paper Industry Group Co., Ltd. 1×(130t+30MW) Solid Waste Comprehensive Utilization Cogeneration Project Environmental Impact Assessment Public Participation Second Announcement
Release time:
2020-08-21
Source:
Xinhua
According to the requirements of the "Environmental Protection Law of the People's Republic of China", "Environmental Impact Assessment Law of the People's Republic of China" and "Measures for Public Participation in Environmental Impact Assessment" (Ministry of Ecology and Environment4Order) and other documents, the public participation information for the environmental impact assessment of the solid waste comprehensive utilization cogeneration project of Xinxiang Xinya Paper Group Co., Ltd.1×(130t+30MW) is hereby announced. The announcement content is as follows:
1. Name and Overview of the Construction Project
Project Name: Solid Waste Comprehensive Utilization Cogeneration Project of Xinxiang Xinya Paper Group Co., Ltd.1×(130t+30MW)
Construction Location: Nanxin Village, Qiliying Town, Xinxiang County, Xinxiang City (within the Xinxiang Xinya Paper Group Co., Ltd. compound)
Nature of Construction:Reconstruction and Expansion
Project Overview: The proposed project is located in Nanxin Village, Qiliying Town, Xinxiang County, Xinxiang City (within the Xinxiang Xinya Paper Group Co., Ltd. compound), with an intended investment of30847.31ten thousandYuan, using the paper waste and paper sludge generated from the Xinya Paper Mill as fuel, to builda1high-temperature and high-pressure circulating fluidized bed boiler, equipped with130t/h×1a condensing steam turbine generator set. Supporting construction includes a thermal system fuel supply system, ash removal system, water treatment system, heating system, power system, thermal control system, desulfurization and denitrification system, and auxiliary production projects.30MW2,
Potential Environmental Impacts of the Construction Project) Waste Gas: The waste gas generated by this project mainly includes dust-containing waste gas from the temporary storage and feeding of paper waste, dust-containing waste gas from the ash removal system, and flue gas from the incineration system. The main pollutants in the flue gas are smoke and dust (particulate matter),
(1CO, acidic gases ({SO,2HCl, HF, NOx, etc.), heavy metals (Hg, Pb, Cr, etc.) and dioxins.HClThe flue gas dust removal uses an electric bag composite dust collector, and the removal of heavy metals and dioxins uses activated carbon injectionHCl+electric bag composite dust collector. The flue gas desulfurization and deacidification uses in-furnace limestone desulfurizationand external semi-dry desulfurization and deacidification processes, and the flue gas denitrification uses low-nitrogen combustionHClchelation reduction denitrification process. The overall treatment process for boiler incineration flue gas includes: low-nitrogen combustionHClin-furnace desulfurizationchelation denitrification
semi-dry desulfurization and deacidificationactivated carbon injectionelectric bag composite dust collectoractivated carbon injection+60mactivated carbon injectionexhaust stack.activated carbon injection) Wastewater: The wastewater from this project mainly includesactivated carbon injectionchemical water treatment systemactivated carbon injectiondrainageactivated carbon injectionboiler continuous drainageactivated carbon injectionand cooling system wastewater.The wastewater from the chemical water treatment system is used forthe existing boiler flue gas desulfurization system of Thermal Power Plant No. 1, dust suppression in the fuel storage, and moisture control in the ash storage. The remaining part is discharged after treatment at the plant's sewage station
(2; the cooling water system drainageand boiler continuous drainageare relatively clean,and can be dischargedto.HCl) Noise: The main noise generated during the operation of the project includes noise from the incineration furnace exhaust; the noise from the construction project mainly comes from equipment noise, vehicle transportation, and loading and unloading noise, among which equipment noise mainly comes from the exhaust of the incineration system, blower noise, flue gas induced draft fan noise, circulating water pump and feed pump noise, circulating cooling tower and air compressor noise, etc.; after comprehensive noise reduction measures such as sound absorption, sound insulation, noise reduction, vibration reduction, damping, and reasonable layout are adopted for the main noise sources, the impact on the sound environment is minimal.) Solid Waste: The solid waste generated by this project mainly includes iron-containing waste slag from the fuel delivery system, fly ash collected by the electric bag dust collector and deacidification reaction tower, boiler slag, waste bags generated from the replacement of bag filters in the bag dust collector, and waste ion exchange resins generated from the water treatment workshop.
to.HCl) Noise: The main noise generated during the operation of the project includes noise from the incineration furnace exhaust; the noise from the construction project mainly comes from equipment noise, vehicle transportation, and loading and unloading noise, among which equipment noise mainly comes from the exhaust of the incineration system, blower noise, flue gas induced draft fan noise, circulating water pump and feed pump noise, circulating cooling tower and air compressor noise, etc.; after comprehensive noise reduction measures such as sound absorption, sound insulation, noise reduction, vibration reduction, damping, and reasonable layout are adopted for the main noise sources, the impact on the sound environment is minimal.以及冷却系统排污水均为清洁废水。化学水处理系统排水部分用于热电一厂现有75t/h锅炉废气脱硫系统补水、燃料库降尘用水以及灰库调湿,剩余部分排至厂区污水站处理后外排;冷却水系统排水及锅炉连排水相对较为清洁,可排至厂区污水站处理后外排。
(3)噪声:项目运行过程产生的主要噪声包括焚烧炉排气噪声;建设项目的噪声主要来自设备噪声、车辆运输及装卸噪声,其中设备噪声主要来自焚烧系统排气、鼓风机噪声、烟气引风机噪声,循环水泵及给水泵噪声,循环冷却塔及空压机噪声等;对主要噪声源噪声采用吸声、隔声、消声、减震、阻尼、合理布局等综合降噪措施后对声环境影响很小。
(4)固废:本项目产生的固体废弃物主要为燃料输送系统产生的含铁废渣、电袋除尘器及脱酸反应塔收集的飞灰、锅炉炉渣、布袋除尘器布袋更换产生的废布袋、化水车间产生的废离子交换树脂等。
Iron-containing waste slag and furnace slag are generally solid waste, which can be comprehensively utilized; waste resin, waste bags, etc. are classified as hazardous solid waste. After temporary storage of waste resin and waste bags in the factory area (the area of the hazardous waste temporary storage room is10m2) it is necessary to entrust a qualified unit for disposal; fly ash temporary storage needs to be managed according to hazardous waste regulations. After the project is operational, it needs to be assessed, and based on the assessment results, it will be determined whether it is hazardous waste. If it is hazardous waste, it needs to be sent to a qualified unit for disposal; if it is general industrial solid waste, it can be comprehensively utilized.
Three,The full text of the environmental impact report draft for public consultation and the ways and means to review the paper report.
Public consultation draft network link:
Link:https://pan.baidu.com/s/1thHIFYpo0fBgY5p5mInCVQ Extraction code:egsp
Ways to review the paper report: Xinxiang Xinya Paper Group Co., Ltd.Guardhouse, using the paper waste and paper sludge generated from the Xinya Paper Mill as fuel, to buildBorrowing for viewing.
Four, publicOpinionsThe network link of the opinion form
PublicOpinionsThe network link of the opinion form:http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html
Five, ways and means for the public to express opinions
After this information disclosure, the public can express their opinions and views on the construction of the project and the environmental impact assessment work through telephone, written correspondence, email, or face-to-face discussions.or environmental assessment unitas follows:
(1)Construction unit: Xinxiang Xinya Paper Group Co., Ltd.
Address: Nanjin Village, Qiliying Town, Xinxiang County, Xinxiang City (within the Xinxiang Xinya Paper Group Co., Ltd. compound)
Contact:Li Haoran
Tel:13782580600
E-mail:yb140102@126.com
(2) Environmental assessment unit: Henan Lvyun Environmental Protection Technology Service Co., Ltd.
Address: Greenland New City, Jinshui District, Zhengzhou City, Henan Province8Building1012No.
Contact: Engineer Liu
Tel:037155695991
E-mail:hnlyhb2016@163.com
Six, the scope and main issues of soliciting public opinions
Scope: The public affected by the project and the public concerned about this project.
Main issues: From the perspective of environmental protection, please state your attitude towards the project regarding the current situation investigation, environmental impact prediction results, pollution prevention measures, project site selection, etc., and briefly explain the reasons.
Seven, the start and end time for the public to express opinions
From the date of announcement10working days。
Xinxiang Xinya Paper Group Co., Ltd.
2020Year8Month21Day